Published: 9 March 2019
We need the brick step path down the side of the house replaced with low maintenance concrete steps that don't go slippery in the winter (no sun on that side of the house). The steps lead down to a flat bricked area that is about 5 x 6m which we want to be replaced with concrete to reduce the need to remove the weeds and moss each year.
#1 | Tradie 1 | No recent reviews | 25 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 37 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 1 job | No longer in contact |
#4 | Tradie 4 | No recent reviews | 18 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 29 jobs | No longer in contact |
Partner with Builderscrack
Get work