Published on 8 September 2022
We're redecorating our dining room and realised this is a good time to get exterior wall insulation installed. We need the existing plasterboard removed, insulation installed and new plasterboard installed. Ideally plastering to a level suitable for wallpaper will be included but we can arrange this separately if required. This room is our temporary kitchen until our new kitchen is installed on Wednesday 14th September. The insulation job could start as early as Friday 16th September.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by an employee of the company
Reviewed on 17 October 2022
Partner with Builderscrack
Get work