Posted 1 year ago
Central Terrace #2
Wood Burner Installation & Repair
Kelburn, Wellington
We are re-roofing and need the top of our coal fire chimney removed, renewed and re-installed. Its a brick chimney to the loft, it then converts to 500mm galv tube still inside the loft and the tube goes through the roof tiles then reduces diameter for a 300mm storm cowling. The roof will be scaffolded and roofing membrane removed, Pitch 45deg. Expected install date mid April/May. Approx 2mtres total from top of brick chimney to cowl. Work needs to be done in conjunction with the roofer