Active job

HeatPump Pre-Pipe work

Job image
Job image

Job description

Aircon & Heat Pump Installation
Wellington

Published: 18 December 2017

need pre-pipe work for heat pump installation - 5 indoor units and 5 outdoor units on a two storey house. This is not a back to back install and in total might need 100m of pair coil run plus 60m of drain pipe. As this is required for a new construction, cabling would be easy to run. No electrical work required for condenser units. Models in mind - ASTG18KMCB – Lounge (First Floor) ASTG12KMCB – Master Bedroom (First Floor) ASTG12KMCB – Ground Floor Bedroom ASTG09KMCB – Other Bedroom (First Floor) ASTG09KMCB – Other Bedroom (First Floor)


Trade professionals

#1 Tradie 1
215 jobs No longer in contact
#2 Tradie 2
67 jobs No longer in contact
#3 Tradie 3 No recent reviews 2 jobs No longer in contact
#4 Tradie 4 No recent reviews 9 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo