Published on 14 May 2024
We need to have a wood burner removed from our property. This will need to include the concrete roof tiles to be replaced. The hole from the flue in the ceiling will need to be patched and painted. The hearth and brick surround to be removed and wall to be gibbed, plastered and painted. All materials (bricks, concrete, fireplace, flue) to be removed from the property.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 25 June 2024
Partner with Builderscrack
Get work