Published on 1 January 2024
Shift an existing split unit heat pump (both the indoor and outdoor units) to the sleep out in the back yard. The unit has 410A gas, so I believe this would need to be retained. It’s currently installed back to back in the house. It needs to be installed back to back in the sleep out (TPS cable is already provisioned in the wall cavity). It will need new copper pipes, approx 2.5m long.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Raj did the job well and really quickly. He could probably do with some more tools to be more prepared - I had to lend a couple to get the job done.