The compressor is installed high on the outside wall. Needs to be lowered to almost ground level to allow for installation of a deck at the current height. Electrical wiring comes up from ground level, plumbing will need extending.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very professional