Published on 28 May 2009
15m House wall requires a trench digging alongside between 1.5m and 2m below ground. This is to allow access to the exposed wall to apply new waterproof tanking. The job will require a trench digging alongside the 15m long wall to a depth of about 2m and 1m wide. The wall will then require waterproof tanking to be applied but this can be done by a seperate contractor if this is not your specialty. Once the tanking is complete the trench will require backfilling, compacting and making good. Relaying of paving on the compacted trench will also be required.
Partner with Builderscrack
Get work