Published: 18 March 2024
I am having an existing heat pump removed and a new one reinstalled. The heat pump will be re-routed and will not be using any of the existing penetrations in the cladding. I require holes in the weatherboard to be filled and sealed as close after the 28th of March on on this date if possible. There is at least 3 larger holes and then a number of screw holes that need to be repaired.
#1 | Tradie 1 |
|
13 jobs | Secured job |
#2 | Tradie 2 |
|
274 jobs | No longer in contact |
#3 | Tradie 3 |
|
36 jobs | No longer in contact |
#4 | Tradie 4 |
|
51 jobs | No longer in contact |
#5 | Tradie 5 |
|
7 jobs | No longer in contact |
#6 | Tradie 6 |
|
73 jobs | No longer in contact |
#7 | Tradie 7 |
|
2 jobs | No longer in contact |
#8 | Tradie 8 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work