Published: 12 April 2015
One loose cedar weatherboard at top of two story house needs to be re-nailed. Kitchen door needs to be rehung. Large painting needs to be hung above staircase on second story of open lobby. Repair one pillar of concrete block and wood fence where the top two concrete blocks came loose and dislodged. Small piece of trellis (still standing) needs to be nailed back into blocks once back up.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Nice guy, turned up exactly on time. Worked hard and completed all work to a high standard.
Work carried out by the owner/operator
Reviewed on 21-04-2015
Tradesperson reply
"Many thanks! All the best!"
Partner with Builderscrack
Get work