Published: 26 February 2015
Need to put some glue on a downpipe put back in place. Joint is on the top of two storey building but able to put ladder on lower roof so height is about 1 1/2 storey high. Also strap the rest of the pipes on to the wall
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Graeme did a very good job and on budget. Very efficient and would be using Graeme again
Work carried out by the owner/operator
Reviewed on 04-03-2015
Partner with Builderscrack
Get work