Published: 2 February 2022
Contract for renovation didn't include replacing door handles X 8 , window stays X2, door stops X 2 or replacing expol underfloor insulation removed during renovation, also replacing other panels that have dropped over time. 2-3m square maximum needs to be replaced.
#1 | Tradie 1 |
|
21 jobs | Secured job |
#2 | Tradie 2 |
|
69 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 14 jobs | No longer in contact |
#4 | Tradie 4 |
|
45 jobs | No longer in contact |
Partner with Builderscrack
Get work