Published: 1 December 2020
-The insinkerator and plumbing needs to be tightened. -Old silicon removed and replaced with new around the bath. -Few Light bulbs to be supplied and changed. -Ensuite bathroom Broken extractor fan and lights (Triangle shaped) needs replacing. -Main door is jammed and needs to be adjusted. -Hood extractor fan needs to be assessed and possibly not working.
#1 | Tradie 1 |
|
108 jobs | No longer in contact |
#2 | Tradie 2 |
|
22 jobs | No longer in contact |
#3 | Tradie 3 |
|
13 jobs | No longer in contact |
Partner with Builderscrack
Get work