Published: 3 January 2014
Handrails on two decks need replacing. They are 6x2 on the flat and as a result the water sitting on the top has ruined them. Main deck has two 45degree joins. 3m x 4m x 1.2m. Second deck is about 4m long in a straight run. On the 45degree joins it needs an expansion joint to avoid what has happened to the existing joins. (Maybe routed and filled with a flexible sealant)
#1 | Tradie 1 |
|
124 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 35 jobs | No longer in contact |
Partner with Builderscrack
Get work