Published: 17 November 2013
The top part of joist is rotting. Looking for builder to repair the rotting part with epoxy. It is a sub floor deck, with deck base height of approx 0.6~1.0meter. Unfortunately the deck floor is nailed to the joist. I would like to get a quote.
#1 | Tradie 1 | No recent reviews | 105 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 49 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
Partner with Builderscrack
Get work