Published: 10 November 2013
I would like 3 power points installed in our house. 2 of them will be on opposite sides of the same wall. (I will provide the power points). An Electrical Code Of Compliance will be required at the end of the installation. A nice quick job!
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great work and was very accommodating with his time. James also did another job for me since this initial engagement and I am very happy with his work.
Work carried out by the owner/operator
Reviewed on 08-12-2013
Tradesperson reply
"Thank you Nizar, I look forward to assisting you again in the future."
Partner with Builderscrack
Get work