Published: 3 December 2019
above the fridge is a cupboard that is in place by 6 Philips screws. So a new fridge can be put in, we need the cupboard to go up by 2 inches Need a philps screw drill and atape measure should take maybe 30-45 mins
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent and professional work and would highly recommend
Work carried out by the owner/operator
Reviewed on 12-12-2019
Partner with Builderscrack
Get work