We have aluminium framed kit set partitioning walls (2.2m high) and at various lengths. They need to be erected (bolted together) using a cordless drill. Once erected the walls need to then be lined with 9mm MDF, fixed using screws to both sides of the aluminium frame. Negative detail where the mdf joins so no joining compound required just a bead. All screw holes filled and walls undercoated. Need a competent handyman to carry out this job. Plus will need a laborer to help with lifting etc. We will have suitable tools on site. Job starts next week Monday, 11th November 2019. We estimate two weeks work to complete this job. I prefer to pay on an hourly rate for this job.