Review

Gibbing / fireplace remodel / tiling

Job image

Job description

General Handyman Tasks
Auckland

Published: 7 September 2013

This is what we have; 1/ Built in wood burning fire, built in to wall so it's front face is pretty much flush with wall / flue is behind wall. 2/ tiling on wall surrounding the fire, which runs up wall to ceiling. Tiles glued to wall. 3/ open shelving on either side of fireplace, from floor up about 2/2.5 feet high. What we'd like; 1/ Open shelving filled in / gibbed over. 2/ tiles removed 3/ preferably no tiling on wall around fire, if possible, otherwise tiling to mantle height and some sort of mantle piece fitted. 4/ wall where tiles have been removed to be fixed ready for painting We'll do any painting ourselves.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo