Published: 17 July 2019
1) Finish painting back steps (only one side done as I left one side 'free' so I could go up and down while the paint was wet!) and replace stair grips 2) Replace fallen off stair grips on front steps 3) Remove insinkerator 4) Install new laundry tub (currently there isn't one installed) 5) Cut and fit a small piece of carpet where I widened a wardrobe (I have some the same) 6) Put in carpet edging strips around the woodburner 7) Replace a small window pane (bit tricky as too high to access from outside) 8) Put fallen downpipe back up (high!) 9) Reroute another downpipe back into drain (I routed it into a rain barrel) 10) Paint the French doors 11) Put up ceiling lining (Dolphin board) in the carport 12) Put up a curtain bracket
#1 | Tradie 1 | No recent reviews | 54 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 14 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 11 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 151 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 41 jobs | No longer in contact |
Partner with Builderscrack
Get work