Published: 11 March 2019
Bathroom sink blocked with glass, bedroom door knob to be fixed, glass shower door needs realigning, cupboard in kitchen needs realigning and cool drawer panel needs to be fixed.
#1 | Tradie 1 |
|
113 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 22 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 23 jobs | No longer in contact |
Partner with Builderscrack
Get work