Published: 10 October 2016
The areas that need painting are the main ceiling, and a toilet ceiling of about 250 m2 in total ceiling area, with two partial side walls and rear block walls, small wall areas needing plastering repairs and the toilet ceiling area needing repairing before painting. The building is a high ceiling building used as a church. The ceiling height may be 3m. Some areas of the ceiling need sanding where paint is flaking. A scaffolding tower can be supplied and paint will be provided. The work needs to be completed before December. The building is used on a Sunday and part of it for band practice on Saturday evening.
#1 | Tradie 1 | No recent reviews | 31 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 7 jobs | No longer in contact |
#3 | Tradie 3 |
|
44 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 11 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 5 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 17 jobs | No longer in contact |
Partner with Builderscrack
Get work