Published: 29 August 2011
Have a problem with the PVC gutters at the front of our property. Set too low under a concrete tile roof so that the water runs down the end edge of the tiles and runs partly behind the back edge of the gutter. Also, fall of the gutters not right and one section of the gutter is bowing so the water is collecting in the middle, rather than running towards the down pipe. One other section of gutter has come out of its clips and needs to be slotted back in.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 29-07-2012
Tradesperson reply
"Thank you"
#1 | Tradie 1 | No recent reviews | 459 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 47 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 207 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 20 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 6 jobs | No longer in contact |
#7 | Tradie 7 |
|
57 jobs | No longer in contact |
Partner with Builderscrack
Get work