Published: 15 March 2016
Hi there, We have bought a pre-assembled shed (see photos - all wall panels premade, coloursteel roof). We now intend to put it on a cobbled area at the end of our garden. The cobbled area is uneven and needs to be replaced by a concrete pad before the shed can be put together. The shed is 2m x 1.4m. We anticipate the pad would be 2.2 x 1.6 or thereabouts (approx. 3.5m2). SHED: --- Scope - Lift up the brick pavers around the area for the slab - Box the area / basecourse / concrete in and level pad etc - Assemble the shed on the pad We anticipate this is two half day jobs potentially a week apart to allow concrete to cure if necessary. Suggestion would be to do this on an hourly rate. Shed may need a second person to do assembly – I can help with this if the assembly is done on a weekend. Work is in Ellersie/Mt Wellington area. Feel free to come take a look.
#1 | Tradie 1 | No recent reviews | 35 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 156 jobs | No longer in contact |
Partner with Builderscrack
Get work