Posted 11 years ago
Brazing
Fireplace & Gas Heating
Waitakere
Hi, I need to braze together a number of components, copper pipe and brass fittings (2", 5/8", 1/2" fittings, etc). I will have all required components, you provide labour and consumables. I can also drop all items to your workshop and wait for you to do the work (I would say maybe 1 - 1.5h). I would much prefer to hear from someone in West Auckland, especially if I drop the items at your workshop.
The attached photos are generic (typical). The panel will have 15 tubes, the pockets are spaced...