Published: 19 November 2021
Cut back a 30M hedge along a ROW driveway, The depth of the hedge is about 1M and needs to be 0.5M depth. Concrete drive alongside. Green waste can either be taken away or put in a gorilla bag on the street (about 50M away) - Need done in the next 2 or 3 days or will have to do it myself!
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 |
|
25 jobs | No longer in contact |
#3 | Tradie 3 |
|
74 jobs | No longer in contact |
Partner with Builderscrack
Get work