Published: 18 January 2024
Notch out existing deck and lay concrete pad 2.7m x 1.3m according to specifications attached. Height of finished pad must be just below decking level which is about 190mm above ground level as can be seen in the photo attached.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Mason and his crew did an amazing job on my concrete pad. He was first off the mark to reach out, submitted a very professional plan and quote, understood the brief perfectly and even suggested some alternate options. He was great to deal with all round and I'm very happy with the result. Highly recommended!
Work carried out by an employee of the company
Reviewed on 18-02-2024
#1 | Tradie 1 |
|
17 jobs | Secured job |
#2 | Tradie 2 |
|
21 jobs | No longer in contact |
#3 | Tradie 3 |
|
3 jobs | No longer in contact |
#4 | Tradie 4 |
|
96 jobs | No longer in contact |
#5 | Tradie 5 |
|
105 jobs | No longer in contact |
#6 | Tradie 6 |
|
21 jobs | No longer in contact |
#7 | Tradie 7 |
|
6 jobs | No longer in contact |
#8 | Tradie 8 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work