Active job

CURBSTONES

Job image

Job description

Placing & Formwork
Henderson, Waitakere

Published on 4 August 2023

Dig out about 22 damaged curbstones and install new - "drive on type" tilt curbstones. Move and install the new tilted horizontal type curb stones about 300 mm further into the flower bed and compact the ground with base metal material and overlay with asphalt. To be done within the next 35 days.


Trade professionals

#1
Tradie 1
23 jobs
No longer in contact
#2
Tradie 2
45 jobs
No longer in contact
#3
Tradie 3
253 jobs
No longer in contact
#4
Tradie 4
1 job
No longer in contact
#5
Tradie 5
3 jobs
No longer in contact
#6
Tradie 6
106 jobs
No longer in contact
#7
Tradie 7
23 jobs
No longer in contact
#8
Tradie 8
106 jobs
No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo