6M x 2.4M cabin needs pile supports.
The ground is not level so different heights are required.
There needs to be post hole boring and piles as per specs.
Trade professionals
#1
Tradie 1
2 jobs
No longer in contact
Get connected now
with NZ’s largest trade professional network