Review

Mancave

Job description

House Piling
Waitakere

When I had mancave (Shed) placed , the shed people didnt do foundations properly . now shed is sinking below deck line .Is there someone out there to help .


Review

Workmanship
4.0
Cost
4.0
Schedule
5.0
Communications
5.0

They were good , quick and no mucking around . Thanx for the extra piles . Did have to connect two piles to man cave , barely touching but am happy with end product , thanx Guys .

Work carried out by the owner/operator
Reviewed on 05-07-2021

Verified Builderscrack review

Trade professionals

#1 Tradie 1
196 jobs Secured job
#2 Tradie 2
109 jobs No longer in contact
#3 Tradie 3 No recent reviews 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo