Active job

Hot tub base

Job description

New Concrete Foundations
Titirangi, Waitakere

Published on 9 May 2016

I am after a price for providing a reinforced concrete base for my hot tub. The footings will already be dug out so it will be a case of laying the 100mm gravel base, steel reinforcement and 100mm of concrete.


Trade professionals

#1
Tradie 1
unrated
3 jobs
No longer in contact
#2
Tradie 2
unrated
8 jobs
No longer in contact
#3
Tradie 3
unrated
23 jobs
No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo