Published: 3 September 2024
Hey we have recently noticed our piles (which is just 2x4) have began to rot on our extension. The extension is roughly 1.5/2m by 3-4m. It's over concrete. I can remove the side boards before hand.
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
#2 | Tradie 2 |
|
115 jobs | No longer in contact |
Partner with Builderscrack
Get work