We need someone to lay approx 12m2 of wood flooring before we install a new kitchen. The kitchen will be ready to start laying flooring on 31 August (give or take a day or two) All wood flooring and glue is provided. The product we are using is European oak engineered flooring from Health Based Building: --- Installation is straight forward so could be done by a builder or experienced DIYer, no specialist flooring expertise is required. Instructions from the manufacturer are here: --- The existing kitchen will have been removed so there will be a clear space approx 4x3m to lay flooring over. There is existing lino that will either need to be lifted or filled in parts to create a level surface to glue the flooring to. Happy to show you through the kitchen if required before committing to a quote.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 20-10-2022