Published on 13 March 2024
Have five rooms that we started to remove existing lino, but work committments means weve run out of time. Wanting done by Easter. Have removed old lino on 2 and prepared floor, grinded, 1 lino removed only, 2 old lino still to be removed, so 3 need preparing concrete floor. Have the lino and glue required, even cut out one toilet room already. Photos of rooms still to be started and rooms ready.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Quick response to posted work, meant job awarded and completed within time required. Went beyond his set time on first day so that all work could be completed in one day. Slight misunderstanding in understanding what I required for which sealant to use therefore wrong one used in some areas, but overall he did a good quality job. I think due to slight difficulty in communication as English is not his first language, I probably should have taken bit more time to clarify.
Work carried out by the owner/operator
Reviewed on 20 March 2024
Partner with Builderscrack
Get work