Published: 17 December 2023
Laying of 2200mm x 220mm engineered timber planks onto cleared fiber cement panels. Have removed previous tiles, cement and skirtings. Have the engineered wood boards and 1 x 20m3 shelleys direct stick tub. Winning contractor will supply labour and rest of direct stick or similar. Expectation to use trowel method to apply glue to ensure consistency. Emergency job to finish before the 22nd of December.
#1 | Tradie 1 |
|
175 jobs | No longer in contact |
#2 | Tradie 2 |
|
114 jobs | No longer in contact |
#3 | Tradie 3 |
|
122 jobs | No longer in contact |
#4 | Tradie 4 |
|
10 jobs | No longer in contact |
#5 | Tradie 5 |
|
6 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | No longer in contact |
#7 | Tradie 7 |
|
7 jobs | No longer in contact |
#8 | Tradie 8 |
|
0 jobs | No longer in contact |
Partner with Builderscrack
Get work