Published: 2 November 2022
Replace floor in a shed. Old floor to be ripped up and replaced, treated for water tightness. I would like the work to be done in early January so I am trying to arrange in advance. I am currently overseas so responses may be delayed.
#1 | Tradie 1 |
|
17 jobs | No longer in contact |
#2 | Tradie 2 |
|
94 jobs | No longer in contact |
#3 | Tradie 3 |
|
5 jobs | No longer in contact |
#4 | Tradie 4 |
|
1 job | No longer in contact |
#5 | Tradie 5 |
|
101 jobs | No longer in contact |
Partner with Builderscrack
Get work