Active job

W.C. Floor change-out

Job image

Job description

Laminate & Floating Flooring
North Shore

Published: 4 August 2022

To include consult to either retile, refurbish or put down a laminate. It may at this stage include the entrance and part hallway, as the w.c. Is within that area. The tiles in the w.c. Also do not match the bathroom. Organising a new toilet. The old w.c. Will be removed, then new flooring.


Trade professionals

#1 Tradie 1
90 jobs No longer in contact
#2 Tradie 2
0 jobs No longer in contact
#3 Tradie 3
25 jobs No longer in contact
#4 Tradie 4 No recent reviews 34 jobs No longer in contact
#5 Tradie 5
9 jobs No longer in contact
#6 Tradie 6
40 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo