Published: 4 August 2022
To include consult to either retile, refurbish or put down a laminate. It may at this stage include the entrance and part hallway, as the w.c. Is within that area. The tiles in the w.c. Also do not match the bathroom. Organising a new toilet. The old w.c. Will be removed, then new flooring.
#1 | Tradie 1 |
|
90 jobs | No longer in contact |
#2 | Tradie 2 |
|
0 jobs | No longer in contact |
#3 | Tradie 3 |
|
25 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 34 jobs | No longer in contact |
#5 | Tradie 5 |
|
9 jobs | No longer in contact |
#6 | Tradie 6 |
|
40 jobs | No longer in contact |
Partner with Builderscrack
Get work