Laying Engineered Timber to home.

Job description

Timber Flooring & Parquetry
North Shore

Published: 30 November 2020

Must be installed 2nd or 3rd week of December. Labour, prep and adhesive only (pre-finished timber supplied). Laying total 140m2 of engineered timber flooring over 2 levels incl 1 straight stair. Scope: prepare and glue fix circa 70m2 on new concrete slab prepare and glue fix 70m2 on existing timber mid-floor. Note: allow for Mid-floor and stair to have 4mm acoustic underlay. Contact me to visit site.