Active job

bathroom floor waterproofing AND laminate flooring

Job image
Job image
Job image

Job description

Laminate & Floating Flooring
North Shore

Published: 28 September 2020

We need a small bathroom floor waterproofed (4 m2) - also supplying a producer statement. We also need vinyl laminate boards laid on the floor (27 m2). We have bought them already and just need them laid -probably with underlay as well - labour only. Timeframe - in about 10 - 14 days time. New build. Flooring is newly laid Plywood.


Trade professionals

#1 Tradie 1
44 jobs No longer in contact
#2 Tradie 2 No recent reviews 2 jobs No longer in contact
#3 Tradie 3 No recent reviews 111 jobs No longer in contact
#4 Tradie 4 No recent reviews 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo