Active job

Kitchen needs a top layer installed over a new floor.

Job description

Timber Flooring & Parquetry
North Shore

Published: 8 November 2017

Kitchen and attached laundry (14m2) recently had a new floor put in but it's a rough wooden base and is in need of a "top". I need to have an underlay installed (which I have 20m2 of on hand) and oak snap-lock wooden floor panels to be installed (i also have enough of this to cover the floor). I'm told they could be installed without the assistance of a professional but I haven't the time nor tools to trim them to fit the angles.


Trade professionals

#1 Tradie 1
35 jobs Secured job
#2 Tradie 2
158 jobs No longer in contact
#3 Tradie 3 No recent reviews 34 jobs No longer in contact
#4 Tradie 4 Not reviewed 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo