Closed job

Flooring Phase 2

Job image

Job description

Solid Timber Flooring
Bayview, North Shore

Published on 27 March 2025

This job is to install flooring for half the house. First have was installed 2 years ago. Job Description: Prep floor and install flooring. Scope of owner - organize the skip, supply flooring, remove floor trim molding, remove carpet, put wood planks into the rooms, replace new floor trim molding when flooring installed. Scope of Contractor: schedule with owner, when the carpet and molding have been removed, the contractor can do any floor prep. When complete, the owner needs 1 day to put the flooring into the rooms. The Contractor will then cut and install the flooring (adhesive and nailing) and apply filler and clear finish to the floor. 3 rooms with closets and 1 hallway Dimensions are : Room 1 - 4m x 3.15m with closet of 2.5m x 0.52m Room 2 - 3.2m x 2.9m with closet of 1.37m x 0.52m Room 3 - 3.3m x 3m with closet of 1.13m x 0.52m Hallway - 6.1m x 0.9m We have 48m of T&G Eucalyptus 25mm flooring that shows 80mm width when installed.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo