Published: 17 April 2023
Need concrete floor prepared as necessary and laminate flooring laid (click together floating floor) approximately 77sqm. Likely mid to late May.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Sam did a very good job installing our laminate. He was meticulous and thorough, communicated well and turned up when he said he would.
Work carried out by the owner/operator
Reviewed on 02-10-2023
Partner with Builderscrack
Get work