Published on 25 March 2025
A new toilet has been installed with a smaller footprint on the front third of the toilet bowl base leaving bare floor exposed. Have some vinyl spare as it was recently laid so looking for someone that can finish this off with cutting, adhesive and seam sealing.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Stephen was on the job within a day, efficient, friendly and both my wife and I are very happy with the result. Highly recommended.
Work carried out by the owner/operator
Reviewed on 26 March 2025
Partner with Builderscrack
Get work