Published: 10 March 2022
Laminate flooring install on small kitchen and bathroom May require existing Lino to be removed from kitchen but likely a direct lay over existing flooring in bathroom. We would love the job to be completed during the second half of March if possible.
Workmanship |
3.0
|
Cost |
5.0
|
Schedule |
2.0
|
Communications |
3.0
|
Needed them to come back after job was finished as carpet lifted from edging within a couple of weeks. Needed to chase a little bit - emails had varied response time (or no response). Phone contact was more reliable.
Work carried out by an employee of the company
Reviewed on 11-06-2022
Partner with Builderscrack
Get work