Published on 25 March 2025
Have a small bathroom that needs vinyl flooring layed before friday this week. I will supply flooring. Floor has been painted with a sealer. Bathroom is being installed Saturday. Photos (blue =bathroom, red= kitchen) measurements are there. Pictures, vanity and toliet only sitting there to show what it will look like This job will continue into the kitchen within a week or two
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Perfect job, fast. Reliable, fully recommended
Work carried out by the owner/operator
Reviewed on 9 April 2025
Partner with Builderscrack
Get work