Published: 18 January 2013
The concrete deck (at ground level) runs the full length of the house with a wrought iron railing in two sections. One section of the railing has come adrift from its moorings which are about 6 - 8 downbolts through existing holes in the base of the fence into the concrete deck. To refix it will probably need drilling new holes into the concrete and inserting new bolts. Also the fence (wooden) next to the front gate needs a brace. My contact details are --- ---
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great guy - if I had more work I would certainly engage him.
Work carried out by the owner/operator
Reviewed on 05-02-2013
Partner with Builderscrack
Get work