Residential section requires a cut and fill job including a batter to level the section in preparation for building a house. Earthwork Requirements 1 Remove tree stumps, shrubs and flax bushes 2 Stockpile topsoil 3 Cut batter as marked on attached diagram 4 Spread topsoil over section 5 Spread and roll gap65 hardfill over building site
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | Not reviewed | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
#4 | Tradie 4 |
|
15 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 |
|
8 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 1 job | No longer in contact |
#8 | Tradie 8 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work