Published: 24 October 2017
I have a slightly sloped site that needs levelling, and the fill removed - the high end needs to drop by approximately 250mm and the low end may need very little removed at all. The area is about 48sqm. There is an existing pile of fill that I have excavated by hand for the retaining wall that's presently under construction which also needs to leave. Sooner is better :-) Please include a full cost in the quote.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Quick response and site visit. 100% accurate quote and excellent workmanship, on time and fully completed. No hesitation to recommend highly to anyone, and when I have further work required, I'll be going straight to Zane.
Work carried out by the owner/operator
Reviewed on 31-10-2017
Tradesperson reply
"Thankyou for the work and instant paymemt."
#1 | Tradie 1 |
|
139 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 24 jobs | No longer in contact |
#3 | Tradie 3 |
|
23 jobs | No longer in contact |
Partner with Builderscrack
Get work