Posted 1 year ago
Small earthworks job
Soil Removal
Birchville, Hutt Valley
Dirt removal, (4’ish trailer loads), level a 5x5m area, (mostly level now), dig 350mm down over a 3x6m area and remove dirt.
Not a huge job, maybe two-three days of someone wants a small one.