Published on 25 March 2024
Hi We need two 'Airtime 660 model' basketball post installed permanently into the ground at our school (basketball court is already painted up) during the school holidays April 12 - May 6th. Installation instructions can be found at --- / FYI but would include the following; * Excavate the holes and fill with concrete * Set up cast in plate * Assemble and erect basket ball hoop * Re asphalt up to new post * This includes both hoops
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
We are very pleased with the work Ryan and his team did installing the 2 Basketball posts. Despite the project being more complex, than first anticipated ,Ryan honoured his original quote. The children are delighted with the end result. Ryan and his team ensured the site was safe at all times whilst working on the job. We would happily use Murrell Contracting in the future. Many thanks Ryan and team. Cathedral Grammar School.
Work carried out by the owner/operator
Reviewed on 14 May 2024
Partner with Builderscrack
Get work